Landis Gyr E360 User Manual -

To download a non-English version, simply select your region from the country selector on the Landis Gyr website before searching for “E360 user manual”.

By consulting the Landis+Gyr E360 user manual and understanding the device's capabilities, you can ensure a safe setup and leverage the full potential of your smart metering system.

Subtracting your export from your total generation (tracked via your solar inverter app) reveals how much solar energy your home consumed directly. 5. Screen Icons and Troubleshooting Indicators

Unlock the full potential of your smart home with our guide to the Landis+Gyr E360. Whether you are looking to track your daily energy spend or connect to a smart home hub, understanding this "IoT-ready" meter is the first step toward lower utility bills and a greener footprint. Meet the Landis+Gyr E360 landis gyr e360 user manual

If the LCD screen is entirely dark and unresponsive to button presses, check your main property breaker. If the main breaker is on, there is likely a widespread grid power outage or a failed incoming phase feeding the meter.

The manual explains how to manually scroll the display using the optical button (often labeled “info” or “enter”) and how to customize the auto-scroll list via software.

A physical push-button used to cycle through display logs, execute commands, or wake the screen from sleep mode. To download a non-English version, simply select your

The manual clearly states that calibration and security keys are protected by utility passwords. Attempting to bypass these may void the warranty.

Fix the meter securely onto the meter board or DIN rail tracking using the dedicated upper and lower mounting holes.

A standardized set of numbers on the far left of the screen that identifies exactly what data is currently displayed (e.g., Total Import vs. Peak Tariff). Meet the Landis+Gyr E360 If the LCD screen

The E360 can store up to 180 days of load profile data (depending on interval length). The manual explains how to:

A dedicated table shows register addresses for reading voltage, current, power factor, and total kWh. System integrators will find this vital for connecting the E360 to building management systems (BMS) or SCADA.

Electricity consumed during peak hours (if on a time-of-use tariff). Tariff 2 Active Import Electricity consumed during off-peak hours. 2.8.0 Total Active Export (

| Error Code | Meaning | Recommended Action | |------------|---------|---------------------| | Err 1 | EEPROM failure | Replace meter | | Err 4 | Phase loss | Check wiring on missing phase | | Err 5 | Reverse phase rotation | Swap two phases (L1/L2) | | Err 10 | CT saturation | Reduce primary current or change CT ratio | | Err 17 | Real-time clock failure | Reprogram date/time via optical port |