Daikin Brc1c51 61 Installation Manual Portable
Align the upper case with the four tabs on the lower case and press firmly until it clicks into place. Finish: Peel off the protective sheet from the display. 4. Initial Setup
The remote controller contains a built-in thermostat. Incorrect placement will lead to poor temperature regulation. the controller 1.5 metres above the floor.
Upon powering up, the controller screen will display or a blinking circle icon. This indicates that the remote controller is actively scanning the P1/P2 network to discover the indoor unit(s) and assign automatic addresses. This process takes 1 to 3 minutes. Do not press any buttons while this auto-check is running. 5. Field Settings Mode (Advanced Adjustment)
Once the wiring is routed to the desired location and the wall/ceiling reinforcement is finished: daikin brc1c51 61 installation manual
Hold down the for at least 4 seconds while the system is in normal stop mode.
Press the once to enter setting mode (the day will blink). Use the UP/DOWN buttons to select the day. Press RTC to confirm and move to the hour setting. Adjust the hours and minutes using the same method.
(2 pieces for securing the backplate) 1.3 Operational & Installation Manual 1.4 2-Core Control Wire (Sheathed connection cable) Electrical Requirements Specification Control Signal Non-polar, 2-wire system Operating Voltage 16V DC (supplied from the indoor unit PCB) Recommended Cable Type Sheathed vinyl cord or cable (2-core) Wire Size AWG 18 to AWG 16 (0.75 mm² to 1.25 mm²) Maximum Run Length 500 meters (total cumulative distance) Safety & Location Planning Align the upper case with the four tabs
Connect the wires directly to terminals on the terminal block inside the controller.
Indoor/outdoor combination failure or improper field setting. Verify system compatibility.
Use the provided wood screws to secure the rear plate directly to the wall surface. Knock out the plastic thin-wall sections on the top or side of the casing to feed the wire through. Initial Setup The remote controller contains a built-in
Insert a flathead screwdriver into the slots at the bottom of the remote controller.
Before beginning the installation, ensure your site conditions and materials meet Daikin's official specifications. Technical Specifications
After physically mounting the controller, use this checklist to ensure the system is correctly set up:
Route the other end of the cable to the indoor unit's control PC board and connect it to the corresponding and P2 (Remote Controller) terminals. 5. Field Settings and Commissioning
The system will enter the Field Setting Mode, indicated by the "Mode No." flashing on the screen. Setting Main/Sub Controllers